Thematic Pulse

Heat – the new supply shock

El Niño is back, and it is arriving into a warmer world.

NOAA confirmed on 9 July 2026 that El Niño is strengthening, with a 97% chance it lasts into early spring 2027 and an 81% chance it becomes “very strong” in October-December, potentially ranking among the largest events in records going back to 1950.1 El Niño is the warm phase of a natural Pacific climate cycle: warm water builds across the central and eastern equatorial Pacific, trade winds weaken, and the ocean releases more heat into the atmosphere.1

El Niño does not cause climate change. But it now operates on a hotter baseline. NOAA reported that June 2026 was the second-warmest June in a 177-year record, at 1.09°C above the 20th-century average.2 A strong El Niño on top of that becomes a stress test for food, water and power.

1. Agriculture: the rice bowl problem

Rice is a useful pressure point because it is a staple for more than half the world’s population and highly sensitive to water availability and heat. The World Bank warned that if El Niño persists into 2027, rice output could fall by 20-50% in affected regions, with South Asia, Southern Africa and parts of East Asia most exposed.3

A drought in one major rice region can quickly become a food-price event, a subsidy event and, in some countries, a political event. Relevant solutions include precision irrigation, soil sensors, laser land levelling, variable-rate farm machinery, drought analytics and seed technologies. Agriculture accounts for roughly 70% of global freshwater withdrawals, so producing more with less predictable water is becoming a core productivity challenge.4

2. Water: the leak you can no longer afford

In a heatwave, every litre of lost water becomes more expensive.

One underappreciated problem is “non-revenue water”: treated water that never reaches a paying customer because of leaks, theft or metering errors. The World Bank has estimated the global cost to utilities at about USD 14 billion per year, and cutting losses in developing countries by half could serve an additional 90 million people.5

Droughts lower reservoirs. Heat raises demand. Ageing pipes lose water before it reaches homes, farms or factories. That puts a premium on leak detection, pressure management, smart meters, pumps, valves and analytics that help utilities find losses before shortages become visible.5

3. Energy resilience: when rivers get too hot to cool power plants

France shows how climate stress can hit even low-carbon power systems. Nuclear power typically provides around two-thirds to 70% of French electricity, but reactors need cooling water.6 During the current European heatwave, unusually warm rivers and low water levels have forced output reductions and temporary shutdowns.7 Le Monde reported in June that heat-related nuclear restrictions affected around 4.6% of France’s nuclear capacity.8

Heat creates a double hit: electricity demand rises through cooling, while parts of the power system become less reliable. To address such problems in a world with a growing power demand investments in grid flexibility are needed: batteries, demand-response software, power electronics, transformers, transmission equipment, building efficiency and efficient cooling. The IEA estimates that meeting national energy and climate goals will require adding or replacing 80 million kilometres of power lines by 2040, with annual grid investment needing to roughly double to more than USD 600 billion by 2030.9

Three Heat Signals To Watch

1 NOAA Climate Prediction Center, ENSO Diagnostic Discussion, 9 July 2026.
Used for: El Niño status, 97% persistence probability, 81% “very strong” probability, mechanism and Pacific ocean-atmosphere conditions.
2 NOAA National Centers for Environmental Information, Global Climate Report: June 2026.
Used for: June 2026 being the second-warmest June in the 177-year record and 1.09°C above average.
3 World Bank, Food Security Update, July 2026.
Used for: El Niño food security risk and potential 20-50% rice output decline in affected regions.
4 FAO / UNESCO water withdrawal statistics.
Used for: Agriculture accounting for roughly 70% of global freshwater withdrawals.
5 World Bank, The Challenge of Reducing Non-Revenue Water in Developing Countries.
Used for: USD 14bn annual cost of non-revenue water and potential to serve 90m additional people by halving losses in developing countries.
6 World Nuclear Association / IEA country data on France.
Used for: France deriving roughly two-thirds to 70% of electricity from nuclear power.
7 The Guardian, July 2026 reporting on warm rivers affecting French nuclear power plants.
Used for: warm rivers, low water levels, Golfech shutdown and output restrictions.
8 Le Monde, June 2026 reporting on French heatwave and EDF nuclear restrictions.
Used for: heat-related restrictions affecting around 4.6% of French nuclear capacity
9 IEA, Electricity Grids and Secure Energy Transitions.
Used for: 80m km of power lines needing addition/replacement by 2040 and annual grid investment needing to double to over USD 600bn by 2030.

Investing involves risk. The value of an investment and the income from it will fluctuate and investors may not get back the principal invested. Past performance is not indicative of future performance. This is a marketing communication. It is for informational purposes only. This document does not constitute investment advice or a recommendation to buy, sell or hold any security and shall not be deemed an offer to sell or a solicitation of an offer to buy any security.

The views and opinions expressed herein, which are subject to change without notice, are those of the issuer or its affiliated companies at the time of publication. Certain data used are derived from various sources believed to be reliable, but the accuracy or completeness of the data is not guaranteed and no liability is assumed for any direct or consequential losses arising from their use. The duplication, publication, extraction or transmission of the contents, irrespective of the form, is not permitted.

This material has not been reviewed by any regulatory authorities. In mainland China, it is for Qualified Domestic Institutional Investors scheme pursuant to applicable rules and regulations and is for information purpose only. This document does not constitute a public offer by virtue of Act Number 26.831 of the Argentine Republic and General Resolution No. 622/2013 of the NSC. This communication's sole purpose is to inform and does not under any circumstance constitute promotion or publicity of Allianz Global Investors products and/or services in Colombia or to Colombian residents pursuant to part 4 of Decree 2555 of 2010. This communication does not in any way aim to directly or indirectly initiate the purchase of a product or the provision of a service offered by Allianz Global Investors. Via reception of this document, each resident in Colombia acknowledges and accepts to have contacted Allianz Global Investors via their own initiative and that the communication under no circumstances does not arise from any promotional or marketing activities carried out by Allianz Global Investors. Colombian residents accept that accessing any type of social network page of Allianz Global Investors is done under their own responsibility and initiative and are aware that they may access specific information on the products and services of Allianz Global Investors. This communication is strictly private and confidential and may not be reproduced. This communication does not constitute a public offer of securities in Colombia pursuant to the public offer regulation set forth in Decree 2555 of 2010. This communication and the information provided herein should not be considered a solicitation or an offer by Allianz Global Investors or its affiliates to provide any financial products in Brazil, Panama, Peru, and Uruguay. In Australia, this material is presented by Allianz Global Investors Asia Pacific Limited (“AllianzGI AP”) and is intended for the use of investment consultants and other institutional/professional investors only, and is not directed to the public or individual retail investors. AllianzGI AP is not licensed to provide financial services to retail clients in Australia. AllianzGI AP is exempt from the requirement to hold an Australian Foreign Financial Service License under the Corporations Act 2001 (Cth) pursuant to ASIC Class Order (CO 03/1103) with respect to the provision of financial services to wholesale clients only. AllianzGI AP is licensed and regulated by Hong Kong Securities and Futures Commission under Hong Kong laws, which differ from Australian laws.

This document is being distributed by the following Allianz Global Investors companies:
Allianz Global Investors GmbH, an investment company in Germany, authorized by the German Bundesanstalt für Finanzdienstleistungsaufsicht (BaFin); Allianz Global Investors (Schweiz) AG; in HK, by Allianz Global Investors Asia Pacific Ltd., licensed by the Hong Kong Securities and Futures Commission; in Singapore, by Allianz Global Investors Singapore Ltd., regulated by the Monetary Authority of Singapore [Company Registration No. 199907169Z]; in Japan, by Allianz Global Investors Japan Co., Ltd., registered in Japan as a Financial Instruments Business Operator [Registered No. The Director of Kanto Local Finance Bureau (Financial Instruments Business Operator), No. 424], Member of Japan Investment Advisers Association, the Investment Trust Association, Japan and Type II Financial Instruments Firms Association; in Taiwan, by Allianz Global Investors Taiwan Ltd., licensed by Financial Supervisory Commission in Taiwan; and in Indonesia, by PT. Allianz Global Investors Asset Management Indonesia is licensed and supervised by Indonesia Financial Services Authority (OJK). Investment through mutual funds contains risk. Before deciding to invest, prospective investors must read and understand the prospectus. Past performance does not guarantee/reflect an indication of future performance.

AdMaster: 5825693

Allianz Global Investors

You are now leaving this website and being redirected to the below website. This does not imply any approval or endorsement of the information by Allianz Global Investors contained in the redirected website nor do Allianz Global Investors accept any responsibility or liability in connection with contained therein.